TECTIC Beta access

Beta · For architecture and construction management in Switzerland

Every number, with its source.

TECTIC builds your detailed estimate from your 3D model or 2D plans, supports you through tender to a documented award decision, and shows where every franc comes from.

No obligation. We reply personally.

AI agents prepare.You decide.

app.tectic.ioDemo project · illustrative figures

Detailed estimate

Residential · 24 apartments · Canton of Fribourg
TotalCHF 11,840,000
Detailed estimate · Demo project · illustrative figures
BKPTradeCHFSourceConfidence
211Masonry and concretePast awards92%
221Windows, exterior doorsEstimate64%
230ElectricalPast awards88%
240Heating and ventilationMarket price81%
271PlasteringPast awards90%
+ 31 more trades
Click an amount to see its source.

The problem

Your numbers live in ten different files.

Every project starts the same way: hunting for a comparable project for the cost estimate, reconciling Excel versions, collecting PDF offers and phone notes. With every plan change, it starts over. TECTIC brings the numbers together in one place, each with its source.

How it works

One continuous thread, from the model to the final invoice.

Each station carries forward the numbers of the one before, source included. The agents prepare, you approve.

  1. Reading

    Your project documents form the basis.

  2. Detailed estimate

    A traceable estimate that you approve.

  3. Tender

    The tender is built from your approved estimate.

  4. Offers

    Offers come together in one place.

  5. Offer comparison

    Made comparable, with reasons. The award is yours.

As of September 30, 2026

Video

TECTIC in two minutes.

The whole workflow, from the model to the final invoice. Live in beta today: stations 1 to 5; the others will follow.

Demo project · illustrative figures · target workflow

Try it

Three offers. Which one would you award?

Masonry and concrete, BKP 211. Pick an offer – a simplified illustration of how TECTIC supports your award.

BKP 211
ContractorA
ContractorBRecommended
ContractorC
Scaffolding
158,400
146,200
missing
Excavation
214,000
206,500
198,700
Concrete and reinforced concrete
1,512,000
1,468,300
1,401,900
Masonry
604,200
588,900
571,300
+ 124 more items
Total
2,874,000
2,791,500
2,655,900cheapest

Demo project · illustrative figures

Reading plans

TECTIC reads your plans, understands them and questions them.

Scale, legend, walls, openings, rooms, checks. Where a wall does not match the legend, TECTIC flags it instead of guessing.

Illustration · redrawn

Detect everythingGround floor · 1:50
Ground floor 1:50 · Illustration · redrawn 1.202.001.002.001.601.402.302.001.5015.009.00Living/diningKitchenCorridorBedroom 1Bedroom 2StairwellStorageShower/WCBathLegendBrick 36 cmBrick 15 cmConcrete 20 cmLightweight 12 cmN0125mGround floor1:50Demo project · redrawn31.2 m²9.5 m²11.9 m²19.1 m²18.2 m²12.0 m²2.1 m²3.4 m²5.6 m²W14: drawn 30 cm, legend 36 cmW26: drawn 12 cm, legend 15 cmW33: drawn 30 cm, legend 36 cm
Plan read

33 walls · 18 openings · 9 rooms · 3 questions

Review proposals
Plan read: 33 walls · 18 openings · 9 rooms · 3 questions

What you can rely on

The agents prepare. People decide.

Nothing takes effect without your approval. Every recommendation comes with its reasons.

Every deviation is traceable.

Who changed what, when and why – fully recorded in the log.

Built for Swiss construction standards.

BKP, NPK, SIA phases, Swiss number formats. A product of Acribion AG, Fribourg.

Questions

What architects ask us first.

Do I need an IFC model?

No. TECTIC takes the quantities from a 3D model (IFC) or from 2D plans. It reads the building specification as a PDF, and contractors submit offers by link, as Excel or as PDF.

Who decides?

You do. The agents propose and explain. Approval, award and every change to the baseline take a click by a person, whose name goes in the log.

Who is responsible for the estimate?

You are, just as today. TECTIC prepares every item with its source and confidence and logs every change. Approval, baseline and award stay with you. TECTIC gives no legal advice.

Where is my project data stored?

Exclusively in Switzerland. To improve our models, we use data from offices only with a signed data agreement and only in aggregated form.

What does beta mean?

The core functions work. You use them with our team on your own project. Anything not live yet is marked as such on this page.

What happens after I request access?

We get in touch personally, talk briefly about your project and then set up your access. To start, one project with its 3D model or 2D plans and building specification is enough.

What does the beta cost?

We discuss the terms with you personally before we activate your access.

Beta access

Start with the project on your desk.

Tell us briefly about your office and your next project.

  • A direct line to the development team
  • Your next project becomes the pilot
  • What you are missing, we build first
e.g. apartment building, 24 units, tender in spring

No obligation. We reply personally and set up your access after a short call.